Highschool ‘Wienerwaldgymnasium’ Tullnerbach

  • Location

    Tullnerbach, Austria

  • Architect

    fasch&fuchs.architekten

  • Client

    BIG Bundesimmobiliengesellschaft m.b.H.

  • Typology

    • Public buildings
  • Competition

    2017

  • Planning

    2018 - 2022

  • Execution

    2020 - 2023

  • Scopes

    • LPH1 Basic analysis construction planning
    • LPH2 Preliminary draft
    • LPH3 Preliminary structural draft
    • LPH4 Submission planning
    • LPH5 Execution planning
    • LPH6 Collaboration in tender procedures
    • LPH7 Support of the construction work
    • LPH8 Collaboration in the local construction supervison
  • Materials

    • Concrete
    • Glass
    • Steel & metal

For the new school project BG/BRG Tullnerbach the existing building was demolished and replaced by a new building. The new building is a monolithic, four-story structure with external dimensions of 77m / 30m / 14.5m in stepped construction.

The axial grid is 7.80m in the longitudinal direction and 8.00-9.00m in the transverse direction.

The floor slab as well as the walls in contact with the ground were designed as a so-called “brown tank”, the supporting structure was founded flat with outcrops under highly loaded columns and core areas.

South of the school, a one-story parking deck with a sports field above was additionally added.