Scope - LPH8 Collaboration in the local construction supervison

Museum of concrete art and design Ingolstadt

Turning a landmarked foundry hall in Ingolstadt into a modern museum is a challenging task: The museum was built underneath the existing structure on basement level. The project was supervised by archaeologists, as it involved a historical city fortification. Underpinning…

Renovation and Expansion BRG Stockerau

The modern school project comprised the renovation of an existing school, the addition of an elevated block of classrooms and a lowered triple gymnasium, and the building of a linking block made of glass. The installed constructional elements – such…

Lycée Français de Vienne

The project entails the modification of the Studio Molière, a solitaire building that was originally constructed as a riding school in the 19th century. Additionally a new building with 12 classrooms was added at the backside of the studio. Meanwhile,…
Vineyard Preisinger

Vineyard Preisinger

The building was planned for a renowned winemaker and provides areas for wine production, storage, office and marketing. The basement with dimensions of approx. 15m x 41m, as well as the cantilevered wall panels (approx. 15m) are executed in reinforced…

Wollzeile 1-3

The general renovation and adaptation of the former municipal office building at the Wollzeile