Scope - LPH2 Preliminary draft

House ZET

For the small house in a typical Viennese allotment garden area, the stand calculation was prepared, including support and participation in all work phases from 1 - 8, up to the local construction supervision.The walls and the roof of the…

Austrian Pavilion at EXPO 2020 Dubai

The shell of the Austrian pavilion is formed by around 38 intersecting cones, which are the same size and cut straight at different heights. Inside, the cone shapes unfold an aesthetic that plays with light and shadow. A shaded courtyard…

Gleinalm tunnel portal

The full expansion of the eight kilometer long Gleinalm Tunnel of the A9 Pyhrn Highway includes the construction of the second tube and the general renovation of the existing tube. In addition to the extensive general renovation of the old…

Adi Dassler Brand Center

A central building for events, presentations, meetings at Adidas headquarters in Herzogenaurach near Nuremberg. For the Adi Dassler Brand Center, Adidas attached importance to a concept that emphasizes the permanent value of the brand in contrast to the changing presentations…