Klosterfrau

  • Location

    Vienna, Austria

  • Architect

    gaupenraub +/-

  • Client

    M.C.M. Klosterfrau Gmbh

  • Typology

    • Building redevelopment
  • Planning

    2008

  • Execution

    2009 - 2010

  • Scopes

    • LPH1 Basic analysis construction planning
    • LPH2 Preliminary draft
    • LPH3 Preliminary structural draft
    • LPH4 Submission planning
    • LPH5 Execution planning
    • LPH6 Collaboration in tender procedures
    • LPH7 Support of the construction work
    • LPH8 Collaboration in the local construction supervison
  • Materials

    • Concrete
    • Steel & metal

An existing office building of the traditional company “Klosterfrau”, built in the 1970s out of exposed concrete, was expanded and modernised in terms of thermal insulation, air-conditioning and lighting. With this project, a special focus was put on maintaining the basic structures and translating the aesthetics of the exposed concrete façade appropriately into a modern look.
An extra office storey was put on top of the building as a lightweight construction, cable arrangements were routed into raised floors and steelwork ramp systems were added. Terraces and newly designed exterior facilities complete the added value for users and visitors.