House H.

  • Location

    Linz, Austria

  • Architect

    Caramel Architekten

  • Client

    Private

  • Typology

    • Office and residential
  • Planning

    2003

  • Execution

    2003 - 2004

  • Scopes

    • LPH1 Basic analysis construction planning
    • LPH2 Preliminary draft
    • LPH3 Preliminary structural draft
    • LPH4 Submission planning
    • LPH5 Execution planning
    • LPH6 Collaboration in tender procedures
    • LPH7 Support of the construction work
    • LPH8 Collaboration in the local construction supervison
  • Materials

    • Concrete
    • Steel & metal