Hietzing Clinic

  • Location

    Vienna, Austria

  • Architect

    Atelier Thomas Pucher

  • Client

    PBG - Vienna Health Network Project Development and Construction Management GmbH

  • Typologies

    • Building redevelopment
    • Public buildings
  • Competition

    2023

  • Planning

    2024 -

  • Execution

    2026 -2039

  • Scopes

    • LPH1 Basic analysis construction planning
    • LPH2 Preliminary draft
    • LPH3 Preliminary structural draft
    • LPH4 Submission planning
    • LPH5 Execution planning
    • LPH6 Collaboration in tender procedures
    • LPH7 Support of the construction work
    • LPH8 Collaboration in the local construction supervison
  • Materials

    • Concrete
    • Glass
    • Steel & metal

Based on the design by Atelier Thomas Pucher—the winning entry in a two-stage, EU-wide architectural competition—one of Europe’s most modern urban hospitals is being built in Vienna. By 2039, Vienna’s First Municipal Hospital will be transformed into a state-of-the-art facility through a combination of refurbishment and new building.

At the heart of the modernization is the construction of a new central hospital that brings all medical services under one roof. The renovation and adaptation of the historic and, in some cases, landmark-protected buildings will take place simultaneously.

The entire project, with a gross floor area of 145,000 m², will be carried out in several construction phases while the hospital remains in operation.

The new clinic’s sustainability strategy provides for an energy supply based on district heating and geothermal energy and is optimally complemented by green roofs, spacious courtyards, and the wind permeability of the entire building complex.

Planned completion: 2039