Material - Concrete

Laimäckergasse Primary and Secondary School

The listed primary school is undergoing extensive refurbishment and is being extended with a modern new building. The architectural design takes the existing trees into account and combines sustainable construction with a contemporary learning environment and quality of stay. The…

Hietzing Clinic

Based on the design by Atelier Thomas Pucher—the winning entry in a two-stage, EU-wide architectural competition—one of Europe’s most modern urban hospitals is being built in Vienna. By 2039, Vienna’s First Municipal Hospital will be transformed into a state-of-the-art facility…

GCP Graz Center of Physics

The new public university building, the Graz Center of Physics, is located in downtown Graz in the immediate vicinity of the Karl-Franzens-University. The majority of the GCP's university laboratories, which require special vibration protection, are housed in the two basement…

Kriehubergasse gymnasium center

The new gymnasium center at Rainergymnasium in Vienna will be arranged on three levels, with access to the gymnasium center via the basement of the existing building. The outdoor sports facilities are located on the ground floor level of the…

Villa P.

The design concept by Najjar & Najjar Architects embeds the detached house in the surrounding landscape. A generously curved, cantilevered roof covers the upper living and garden level and provides a generous view of the city. The roof is equipped…

BORA Niederndorf

The new BORA office building on the Inn river in Niederndorf complements the existing buildings. Large terraces are arranged on the east and west sides of the second floor, which are supported by steel trusses on the fourth floor with…

Kris Lemsalu – Sculpture Chará

The five-meter-high and 3.5-meter-wide sculpture Chará - a temporary installation at Kunstplatz Graben in downtown Vienna - is designed in pink paint that is visible from afar. With the jaw and approximating heart shape, the artist refers to popular culture…

Temporary Parliament

For the duration of the renovation of the parliament building, three temporary replacement buildings were erected on Heldenplatz and in the library courtyard of the Hofburg as alternative quarters. After completion in April 2017 and the subsequent move out of…

Highschool ‘Wienerwaldgymnasium’ Tullnerbach

For the new school project BG/BRG Tullnerbach the existing building was demolished and replaced by a new building. The new building is a monolithic, four-story structure with external dimensions of 77m / 30m / 14.5m in stepped construction. The axial…

IKEA Vienna Westbahnhof

The world's first car-free, urban IKEA is located at Vienna’s railway station ‚Westbahnhof‘  and opened in 2021. Customers will not come by car, but by public transport, by bike or on foot. In search of ideas for the inner-city location,…