The five-meter-high and 3.5-meter-wide sculpture Chará - a temporary installation at Kunstplatz Graben in downtown Vienna - is designed in pink paint that is visible from afar. With the jaw and approximating heart shape, the artist refers to popular culture…
Weiterlesen
For the duration of the renovation of the parliament building, three temporary replacement buildings were erected on Heldenplatz and in the library courtyard of the Hofburg as alternative quarters. After completion in April 2017 and the subsequent move out of…
Weiterlesen
For the new school project BG/BRG Tullnerbach the existing building was demolished and replaced by a new building. The new building is a monolithic, four-story structure with external dimensions of 77m / 30m / 14.5m in stepped construction. The axial…
Weiterlesen
The world's first car-free, urban IKEA is located at Vienna’s railway station ‚Westbahnhof‘ and opened in 2021. Customers will not come by car, but by public transport, by bike or on foot. In search of ideas for the inner-city location,…
Weiterlesen
The old lift system from the mountain station of the Ifinger cable car in the east of Merano has been replaced by a modern gondola lift. A new middle station now opens up an attractive viewpoint of the landscape in…
Weiterlesen
Directly at the freeway exit to Herford, a new BORA location was situated as a flagship store with sufficient space for exhibition, training, restaurant and events. The remarkable metal façade - a combination of galvanized and differently perforated steel parts…
Weiterlesen
With the VinziRast in the countryside project, a former hotel and restaurant with an impressively large usable area of 3,500m² was converted into a farm with permaculture agriculture for fruit and vegetable cultivation and small animal husbandry. Since 2023, formerly…
Weiterlesen
The temporary installation VOR ORT - On Site - by Austrian artist Hannes Zebedin can be seen at Kunstplatz Graben until the beginning of November 2022. The four-meter high and 80 m² site-specific work made of concrete and clothing deals…
Weiterlesen
In the southeast of Neu-Ulm, a new neighborhood with 40 subsidized and 30 privately financed apartments was built in two construction phases. With the chosen construction method of a reinforced concrete skeleton and partition walls in lightweight construction, a use-oriented…
Weiterlesen
The existing buildings of the restaurant and agricultural complex, which had grown over generations, were renovated to a high standard and supplemented with additional buildings. Two new glass houses are embedded in the given slope situation and connected to the…
Weiterlesen