The old lift system from the mountain station of the Ifinger cable car in the east of Merano has been replaced by a modern gondola lift. A new middle station now opens up an attractive viewpoint of the landscape in…
Weiterlesen
Directly at the freeway exit to Herford, a new BORA location was situated as a flagship store with sufficient space for exhibition, training, restaurant and events. The remarkable metal façade - a combination of galvanized and differently perforated steel parts…
Weiterlesen
The temporary installation VOR ORT - On Site - by Austrian artist Hannes Zebedin can be seen at Kunstplatz Graben until the beginning of November 2022. The four-meter high and 80 m² site-specific work made of concrete and clothing deals…
Weiterlesen
In the southeast of Neu-Ulm, a new neighborhood with 40 subsidized and 30 privately financed apartments was built in two construction phases. With the chosen construction method of a reinforced concrete skeleton and partition walls in lightweight construction, a use-oriented…
Weiterlesen
The existing buildings of the restaurant and agricultural complex, which had grown over generations, were renovated to a high standard and supplemented with additional buildings. Two new glass houses are embedded in the given slope situation and connected to the…
Weiterlesen
The 'Forum Am Seebogen' emerged as the winning project from a concept competition for an "open-use townhouse". The possibilities of modular timber and system construction were further developed and implemented in contemporary prototypes. werkraum ingenieure were involved in this pioneering…
Weiterlesen
An invited competition was held for a new circular path around Mauterndorf Castle and six artists were invited to develop an artistic intervention for this special place. A jury of experts, representatives of the castle administration, the market town of…
Weiterlesen
The four-class older building, a mixed construction, is supplemented with an addition in timber construction and eight new classes. The bungalow concept of the first construction phase was taken up in the extension and supplemented by an above-lying beam with…
Weiterlesen
The new school campus Bürgerspitalwiese houses a 17-class all-day primary school and a 16-class secondary school for 825 children. With architect Patricia Zacek-Stadler, we planned as ARGE. Together, the ARGE was responsible for general planning management and control, structural planning…
Weiterlesen