On a plot of land owned by the Lazarists in Vienna-Hetzendorf, a residential village for long-term homeless people was built using the simplest of methods and donated building materials - windows, flooring and façade panels. The residential modules were built…
Weiterlesen
In the course of the general renovation, the Canisianum student dormitory in Innsbruck, which was built in 1910/11, was completely reorganised. Office and day-centre uses are now arranged in the north wing and the rooms in the south and middle…
Weiterlesen
The four-class older building, a mixed construction, is supplemented with an addition in timber construction and eight new classes. The bungalow concept of the first construction phase was taken up in the extension and supplemented by an above-lying beam with…
Weiterlesen
A hotel with 100 suites, restaurant, bar and conference rooms is being built in the historic building of the Erste Bank headquarters in Vienna's city center. The Erste Bank building at Graben 21 is being refurbished according to the plans…
Weiterlesen
The shell of the Austrian pavilion is formed by around 38 intersecting cones, which are the same size and cut straight at different heights. Inside, the cone shapes unfold an aesthetic that plays with light and shadow. A shaded courtyard…
Weiterlesen
The residential complex Rüdengasse is part of the redevelopment of Vienna's Erdberg district. Existing green spaces were specifically linked with new ones and enable an opening to the recreational space along the Danube Canal. The eight-storey building houses 126 flats…
Weiterlesen
Modification of a shop, Vienna The existing cladding was removed and the small ground floor was opened to design a smooth crossing from the Mariahilferstraße into the unisex-store. The glasfront opens the store and allows interesting insights. An asymmetric, slender…
Weiterlesen
The expansion of a building located in a Viennese “protected zone” – comprising the construction of parking spaces on the basement level, the demolition and additions to the yard wing, and the addition of another three storeys – required a…
Weiterlesen
The general renovation and adaptation of the former municipal office building at the Wollzeile
Weiterlesen