The motto “Composing the Future” of the Austrian pavilion is conveyed by an oversized, spiral-shaped band of musical notes made of wood - on the pavilion façade. The wooden construction was ceremoniously presented on Monday in the production halls of Graf Holztechnik in Lower Austria and is now on its way to Osaka, Japan.
Architectural concept: BWM Designers & Architects
Weiterlesen
The redesign of the 'Von Köck' jewelry boutique in the historic building on Graben uses an innovative store concept to create a cross-level spatial sculpture that has an effect that extends outwards into the urban space.
Architecture: Smartvoll Architekten
Weiterlesen
The 'House of Schools' - HOS - is organized with three new 'schools' as a compact group on the western edge of the site and follows the new parking garage at a short distance.
The exposed concrete of the new House of Schools is of the finest quality and is very impressive.
Architecture: querkraft architekten
Weiterlesen
Werkraum ingenieure were in full female power at the ground-breaking ceremony for the GCP - Graz Center of Physics - in Graz. The excitement about the start of construction is written all over our colleagues' faces.
The GCP with space for 1700 students and 600 employees will open in 2030.
Architecture: fasch&fuchs.architekten
Weiterlesen
Two awards at the BIG SEE Architecture Award 2024!
For BORA flagship store in Herford - Germany, and BORA in Niederndorf -Tyrol/Austria, both buildings we planned and built together with the architectural office LORENZATELIERS.
Weiterlesen
The innovative bridge with timber core over the S37 Klagenfurt highway was inspected by werkraum ingenieure.
Weiterlesen
KLAMMER*ZELENY Architekten won the open competition for the new 'Am Kempelenpark' School.
A nine-grade, all-day elementary school will be planned and built in the new quarter in Vienna-Favoriten in the next few years.
Architecture: KLAMMER*ZELENY Architekten
Structural planning: werkraum ingenieure
Weiterlesen
We are represented with the contribution 'BORA Flagshipstore, Herford, Germany' at the architecture festival TURN ON on Friday, February 23rd, and we are already looking forward to it!
Lorenzateliers | werkraum ingenieure | Pichler projects
In dialogue: Peter Lorenz | Martin Schoderböck | Sebastian Eisat
Weiterlesen
The new building with a double gym, kindergarten and an innovative production kitchen will be ready for move-in this spring.
The second construction phase and the refurbishment of the existing school will begin with the semester break in February and the relocation of the elementary school children to an alternative location.
Architecture: fasch&fuchs.architekten
Structural planning: werkraum ingenieure
Weiterlesen
The new year 2024 is already in full speed.
With a boost from 2023 - a successful year with numerous great collaborations and competition wins, such as the Secondary practical school, Salzburg University of Education with alexa zahn architekten - we are looking forward to the year ahead.
We would like to take this opportunity to thank our cooperation partners for the confidence they have placed in werkraum ingenieure and look forward to working with them in the coming months and years!
Weiterlesen